Key Gaza cancer hospital demolished
The Turkish-Palestinian Friendship Hospital and medical school was built and equipped by the Turkish Cooperation and Coordination Agency (TIKA), a government agency similar to USAID.
Construction on the hospital began in 2011 and was completed in 2017, at a cost of $70m.
The hospital was considered the largest medical facility in Gaza, with total interior space of 33,400 square metres (359,514 square feet ).
@palestine
#Gaza
#hospitals
The Turkish-Palestinian Friendship Hospital and medical school was built and equipped by the Turkish Cooperation and Coordination Agency (TIKA), a government agency similar to USAID.
Construction on the hospital began in 2011 and was completed in 2017, at a cost of $70m.
The hospital was considered the largest medical facility in Gaza, with total interior space of 33,400 square metres (359,514 square feet ).
@palestine
#Gaza
#hospitals